Buzzard Creek Fence Realignment - GMUG National Forest
Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159086248537196 |
Posted Date: | Aug 16, 2023 |
Due Date: | Sep 4, 2023 |
Solicitation No: | 1240LT23Q0122 |
Source: | https://sam.gov/opp/271b73b5b7... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Original)
- All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
- Original Published Date: Aug 16, 2023 04:27 pm MDT
- Original Date Offers Due: Sep 04, 2023 05:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Sep 19, 2023
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 5660 - FENCING, FENCES, GATES AND COMPONENTS
-
NAICS Code:
- 238990 - All Other Specialty Trade Contractors
-
Place of Performance:
Grand Junction , CO 81501USA
Buzzard Creek Fence Realignment
Grand Valley Ranger District - GMUG National Forest
PoP: 10 days after Notice to Proceed with project extending into the 2024 Season if needed
Fence Removal
Furnish all supervision, equipment, tools, parts, labor, transportation, lodging, and miscellaneous items for rangeland fence removal. 2.3 miles of existing laydown fence material will be removed; including all posts, wire, braces and stays. All post holes will be filled with existing overburdened soil material. The removed material will be evaluated for condition. Any reusable material will be transported, by the contractor, to the Hightower Guard Station specified in the Buzzard Creek Fence Realignment Planning Map. Any un-useable material will be transported, by the contractor, to be disposed or recycled.
Fence Construction
Furnish all supervision, materials, equipment, tools, parts, labor, transportation, lodging, and miscellaneous items for rangeland fence construction. The bulk of the work will include the construction of 1.3 miles of wood post and wire laydown fence. The fence construction will require the placement of 8 ft wire gates every 1/4 mile of straight fence line as well as every corner section fence as identified in the Buzzard Creek Fence Realignment Planning Map. This map also indicates the location of the fence being required Fence construction and gate specifications are attached Constructing a laydown fence. Clearing and pruning of vegetation along fence construction lines will be required within 5 ft of both sides.
- WHITE RIVER NATIONAL FOREST 900 GRAND AVENUE
- GLENWOOD SPRINGS , CO 81601
- USA
- Lonnie D Root, Contracting Officer
- lonnie.root@usda.gov
- Justin Bennett
- justin.c.bennett@usda.gov
- Aug 16, 2023 04:27 pm MDTSolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.