Colorado Bids > Bid Detail

Notice of Intent to Sole Source - DFC Elec Infrastructure - Y-Side Substation Transformer Replacement info alert Note: There have been new actions to this contract opportunity. To view the most recent action, please click here .

Agency: GENERAL SERVICES ADMINISTRATION
Level of Government: Federal
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
Opps ID: NBD00159810611623307
Posted Date: Dec 14, 2022
Due Date: Jan 1, 2023
Solicitation No: 47PJ0022R0102-1
Source: https://sam.gov/opp/bc818fa2b4...
Follow
Notice of Intent to Sole Source - DFC Elec Infrastructure - Y-Side Substation Transformer Replacement
info alert

Note: There have been new actions to this contract opportunity. To view the most recent action, please click here .

Active
Contract Opportunity
Notice ID
47PJ0022R0102-1
Related Notice
Department/Ind. Agency
GENERAL SERVICES ADMINISTRATION
Sub-tier
PUBLIC BUILDINGS SERVICE
Office
PBS R8
General Information
  • Contract Opportunity Type: Special Notice (Original)
  • All Dates/Times are: (UTC-07:00) MOUNTAIN STANDARD TIME, DENVER, USA
  • Original Published Date: Dec 14, 2022 11:57 am MST
  • Original Response Date: Jan 01, 2023 10:00 am MST
  • Inactive Policy: Manual
  • Original Inactive Date: Jan 01, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 6120 - TRANSFORMERS: DISTRIBUTION AND POWER STATION
  • NAICS Code:
    • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • Place of Performance:
    Lakewood , CO 80225
    USA
Description

Construction activity at the Denver Federal Center to repair/replace the Y-Side Substation transformer, one of two existing primary substation transformers at the DFC. Project would include Project would include the engineer and design a set of construction documents and specifications for the civil, structural, and electrical work for the replacement of the “Y” side Substation. The design shall incorporate the transformer and switchgear. Including the manufacturer engineering, purchase, and deliver a new “Y” side Substation transformer to match the performance characteristics of the existing “X” side Substation transformer. Project would include engineering, purchase, and deliver a new 15kv “Y” side switchgear. New switchgear sections shall match the existing section’s purpose with new circuit breakers, protective relays, and metering cabinets. Design a new foundation sized and engineered to meet the geotechnical conditions and weight of the new transformer and equipment to be installed. Construct an oil retention pit or curb, with tank. Remove and install a new concrete duct bank from the transformer to the existing switchgear pad. Coordinate demolition of existing equipment as well as installation dependent on timing of equipment delivery.


Attachments/Links
Contact Information
Contracting Office Address
  • ACQUISITION MANAGEMENT DIVISION W 6TH AVE&KIPLING STREET
  • LAKEWOOD , CO 80225
  • USA
Primary Point of Contact
Secondary Point of Contact
History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >