Colorado Bids > Bid Detail

Electric Grid Capacity Study

Agency: Denver
Level of Government: State & Local
Category:
  • B - Special Studies and Analyses - Not R&D
Opps ID: NBD10581747488264941
Posted Date: Jul 6, 2023
Due Date: Aug 18, 2023
Source: https://www.denvergov.org/Gove...
Electric Grid Capacity Study

Closing date August 18, 2023, 10:00 AM

  • Reference number CASR-202368218
  • Status Open
  • Summary Denver desires to solicit proposals for professional services to provide a study: (1) assessing the ability of portions of Denver’s electric grid to meet Denver’s electrification goals, and (2) to determine and prioritize utility, regulatory, and/or municipal recommendations to prepare the distribution system for rapid electrification in Denver.
Summary

Denver desires to solicit proposals for professional services to provide a study:

  • Assessing the ability of portions of Denver’s electric grid to meet Denver’s electrification goals
  • To determine and prioritize utility, regulatory, and/or municipal recommendations to prepare the distribution system for rapid electrification in Denver
Purpose

In an effort to support its decarbonization efforts, CASR is seeking one or more qualified consultants for professional services to provide a study related to ability of Denver’s electric grid to meet Denver’s electrification goals. Key topic areas of the study include:

  1. Load forecasting;
  2. Identification of distribution- and service-level capacity bottlenecks in representative areas of the City and County of Denver;
  3. Assessment of the electrical demand impacts, and strategies to mitigate that demand, pertaining to building electrification and electric vehicle (“EV”) charging;
  4. Evaluation of utility resources, tariffs, and regulatory allowances to support system investments; and
  5. Review of issues related to permitting, zoning, codes, and standards that most support or inhibit Denver’s goals.

Goals

The goals of this study are:

  • To provide quantitative information that supports Denver in developing a mutual understanding with PSCo regarding the potential near-term, mid-term, and long-term electric distribution grid infrastructure impacts resulting from electrification scenarios within three to five specific areas of Denver in the next decade, and how demand management opportunities may mitigate those impacts;

  • To investigate and identify, particularly through the lens of the load forecasting scenarios, key barriers to building and transportation electrification in the following four areas, at a minimum:
    • Load Forecasting and Distribution Standards
    • Developer Pre-Application Processes and Design Support
    • Cost Allocation and Recovery for Distribution Grid Upgrades
    • Coordination between Utility Requirements and Municipal Zoning, Permitting, Codes, and Standards
  • To determine and prioritize changes and/or additions to distribution planning processes, utility tariffs, municipal or utility requirements (e.g., zoning, permitting, codes, standards), and/or cost recovery mechanisms to prepare the distribution system for rapid electrification while minimizing costs.
Application
  • 7/06/2023: Issuance of RFP via BidNet
  • 7/18/2023: Pre-proposal meeting at 10:00 a.m. on Microsoft Teams
  • 7/24/2023: Any final questions regarding this RFP must be submitted via BidNet by 10:00 a.m. local time
  • 7/28/2023: CASR will issue responses to questions via BidNet
  • 8/18/2023: Final submissions due by 10:00 a.m. local time
Contact details
High Level Details

Estimated Project Budget: $200,000

Contract Term: 36 months

Final proposals are due Friday, August 18 at 10 a.m.