Description:
|
*Addendum No. 1 - 03-08-2023
**Addendum No. 2 - 03-13-2023, New Bid Due Date!
The Scope of Work to be performed for this Contract will consist of installing a 12” x 12” “wet tap” to an existing FCLWD waterline on the west side of Colorado Boulevard and installing approximately 280 LF of new 12” potable waterline to the east across Colorado Boulevard and south to connect with an existing Town of Windsor waterline. In addition, the scope of work includes installation of a cast-in-place meter vault with two PRV’s, several gate and butterfly valves, site restoration, and other miscellaneous work as indicated on the drawings and as specified herein.
|
Publication Date/Time:
|
2/17/2023 12:00 AM
|
Publication Information:
|
Town Website
|
Closing Date/Time:
|
3/17/2023 2:00 PM
|
Submittal Information:
|
See Project Manual
|
Bid Opening Information:
|
03/17/2023 @ 2:00 PM
|
Addendum Date/Time:
|
03/08/2023 - Addendum No. 1, 03/13/2023 - Addendum No. 2
|
Pre-bid Meeting:
|
Mandatory, 02/28/23 @ 10:30 AM
|
Contact Person:
|
Doug Roth
droth@windsorgov.com
Town of Windsor
301 Walnut Street
Windsor, CO 80550
|
Download Available:
|
Yes: Submit Bid Request Form
|
Fee:
|
No Hard Copies, Free download
|
Plan & Spec Available:
|
Electronic Copies Only; submit Bid Request Form for full project manual.
|
Business Hours:
|
8:00 AM to 5:00 PM
|
Miscellaneous:
|
An electronic copy of the bid documents can be requested by submitting a Bid Request Form. There is no cost associated with electronic bid documents.
|
Related Documents:
|
|